Sunday, January 10, 2010

My final day in the BVI was a busy one, with lots of small tasks aboard Zanshin to complete ranging from cleaning out and defrosting the fridge to cleaning the bilges and storing the dodger and bimini. I finished those tasks by noon and them put the boat into the Nanny Cay haul out pit so that Zanshin could be hauled first thing on Monday morning. My flight was scheduled for 5pm, so I arranged to get to Beef Island airport at 3pm and (how could things be different with LIAT) the flight didn't leave until after 6pm. I had taken Carmen and Bernd's recommendation for the Halcyon Cove hotel in Antigua and was well pleased with that choice, the only problem was that the air conditioning in the room was turned on and the remote was missing so I couldn't turn it off or raise the freezing room temperature by any means other than opening the windows and patio doors..

Trellis Bay's "D' Best Cup" only 100 yards from the terminal building Trellis Bay It looks like a GP180 Avanti from gates Learjet and Piaggio on the tarmac Scrub Island construction seen right after takeoff from Beef Island
D'Best Cup Trellis Bay and Aragorn's Studio Looks like a Rutan but is an Avanti Scrub Island new resort construction

3 Previous Day 5 Calendar 4 Next Day